不知火舞的被虐|伊人天伊人天天综合网|博洛尼亚天气|任你懆这里只有精品4|久久美日韩精品久久|掌中之物漫画免费阅读观看|0丨d老妇

ABAQUS樁基計算不收斂問題,求問?

瀏覽:2657 回答:1

具體warning信息為:

Node 1300 instance soil-1 is common between the contact pair (assembly_soil-1_zhuang2-zs-sizhou, assembly_soil-1_soil-zhuang2-zs-sizhou). No constraint is formed for this node.

Warning message limit reached. No further warning messages will be reported.

Solver problem. Zero pivot when processing D.O.F. 1 of 49 nodes. The nodes have been identified in node set WarnNodeSolvProbZeroPiv_1_1_1_1_1.

The strain increment is so large that the program will not attempt the plasticity calculation at 44439 points

The plasticity/creep/connector friction algorithm did not converge at 2 points

Program is asked to invert a singular matrix

The strain increment is so large that the program will not attempt the plasticity calculation at 42610 points

諸如此類。。。。

我設置的樁和土體摩擦接觸,樁底和土tie約束。不知何故,無法收斂。

ABAQUS樁基計算不收斂問題,求問?的圖1

ABAQUS樁基計算不收斂問題,求問?的圖2

邀請回答 我來回答

全部回答

(1)
默認 最新
王琰

用節點集合去設置約束和接觸,這樣可以避免邊緣的節點同時參與約束和接觸,形成過約束。另外根據你的提示信息,可能是某些節點沒有納入到約束中,有單元應變很大導致無法收斂

2019年3月6日
已采納 評論 點贊 2

沒解決?試試專家一對一服務

換一批
    App下載
    技術鄰APP
    工程師必備
    • 項目客服
    • 培訓客服
    • 平臺客服

    TOP