節(jié)點(diǎn)過約束怎么解決? 20

瀏覽:3642 回答:4

我在模擬基坑開挖時,圍護(hù)結(jié)構(gòu)地連墻底面與土用tie的連接,運(yùn)行時出現(xiàn)錯誤:1 nodes are used more than once as a slave node in *TIE keyword. These constraints are not removed either due to the presence of *CONSTRAINT CONTROLS,NO CHANGES keyword or because removing the constraints might affect the model. The nodes have been identified in node set ErrNodeOverconTieSlave.

4 *TIE dependent nodes have specified boundary conditions.  Their associated *TIE independent nodes have, however, conflicting boundary conditions. Please resolve these conflicting boundary conditions. The *TIE dependent and independent nodes have been identified in node set WarnNodeOverconBoundTieInc.

Analysis Input File Processor exited with an error.


邀請回答 我來回答

全部回答

(1)
默認(rèn) 最新
狗尾草

輔節(jié)點(diǎn)重復(fù)使用了,或者在輔節(jié)點(diǎn)上施加了約束。

可以更新其中一個*TIE,不選擇那個節(jié)點(diǎn)

2018年9月18日
已采納 評論 3 點(diǎn)贊