abaqus水力壓裂任務(wù)提交多次報(bào)錯(cuò)如何解決?
該模型為三層圓餅的柱狀模型,注水點(diǎn)應(yīng)設(shè)置在圓柱上表面中心處(其實(shí)這里的inp文件的注水相關(guān)語句無法確定),因?yàn)檫€在摸索練習(xí)選擇了提交job,之后就在abaqus中運(yùn)行后彈出這個(gè)提醒:
The executable standard.exe aborted with system error code 1073741819. Please check the .dat, .msg, and .sta files for error messages if the files exist. If there are no error messages and you cannot resolve the problem, please run the command "abaqus job=support information=support" to report and save your system information. Use the same command to run Abaqus that you used when the problem occurred. Please contact your local Abaqus support office and send them the input file, the file support.log which you just created, the executable name, and the error code.
參考現(xiàn)有的有限資料重新建模多次,該問題始終無法解決,不知材料或裝配等哪里出現(xiàn)問題,非常不解。現(xiàn)將inp文件以txt附上,望各位大觸不吝賜教。
初學(xué)仿真,因?yàn)闆]有師兄老師指教,可能問的問題很基礎(chǔ),非常不好意思以及非常的感謝。
祝大家工作學(xué)習(xí)順利。

星辰_北極星 


















